P-02 · Apartment

Nasr City apartment

A 25-year-old flat: we replaced the old groundwork and opened the kitchen to the dining area.

Location
7th District, Nasr City
Area
120 m²
Duration
9 weeks
Level
Standard
The Nasr City apartment kitchen after finishing, from the same angleThe Nasr City apartment kitchen before finishing: bare plaster and concrete floor
Drag the line or use the arrow keys to compare.

Scope of work

  • Removing old tiles and plaster
  • New pipes and drains
  • Open kitchen with stone counter
  • Tiles and paint

Materials

  • First-grade Egyptian tiles
  • Quartz counter
  • Concealed mixers

Stages

The actual schedule in weeks (9 weeks). Some stages overlap because crews work in parallel.

  1. Strip-outWeek 1–2
  2. New groundworkWeek 2–4
  3. Plaster and tilesWeek 4–6
  4. Kitchen and paintWeek 6–8
  5. HandoverWeek 8–9