Finishing • Renovation • Fit-out

Every item written down, every stage on a date

We finish apartments, villas and shops across Greater Cairo. You know what you pay for before we start, and you see where the work stands every week.

The same living room finished: porcelain floor, hidden lighting and light paintAn apartment living room in bare plaster before finishing
Same room, before and after. Drag the line.

Services

From bare plaster to the keys

A fully finished apartment, living room open to the dining area

Full finishing

From bare plaster to handing you the keys: electrics, plumbing, floors, gypsum, paint and doors.

An older flat after renovation: classic ceiling, parquet floor and balcony doors

Renovation

We strip the old finish and check the groundwork before anything new goes on top.

A kitchen with a central island and light timber cabinets

Kitchens & bathrooms

Proper waterproofing, drains and pipes first, then tiles, stone and fittings.

An office reception after fit-out: a counter and waiting chairs

Commercial fit-out

Pharmacies, shops and small offices, on a schedule built around your opening date.

How we work

Five steps, each one on paper

  1. Site visit

    One visit

    An engineer measures the unit, checks the groundwork and listens to what you want.

  2. Written quotation

    Within 3 days

    Every item with its quantity, material and price, so you can compare and adjust.

  3. Timeline

    Before we start

    Dated stages, who works when, and which stage needs a decision from you.

  4. Execution

    Weekly report

    One site supervisor throughout, with photos and a short WhatsApp report every week.

  5. Handover

    Item by item

    We walk the unit with you on a checklist and fix every note before the keys change hands.

Our work

Handed-over projects

All projects

Before you ask the price

What sets the cost of finishing?

A price per metre alone isn't enough. These five things move the final number most, and all of them are written into the quotation.

Try the cost estimator
Factors that affect the price
The unit's conditionA unit in bare plaster costs less than one that needs demolition and new groundwork.
Material levelPorcelain, sanitary ware and paint move the price more than anything else.
Kitchens and bathroomsThese are the most expensive square metres: waterproofing, plumbing, tiles and fittings.
Ceilings and lightingA flat ceiling costs less than one with levels, hidden lighting and track lights.
Location and accessFloor, lift access and compound working hours affect transport and site hours.

Start with a visit, no commitment

An engineer comes to measure and look, and the quotation reaches you in writing.

Book a site visit